Производственная литература
Jiazheng Pan. Large Dams in China. A Fifty - Year Review
Автор(ы)
|
Shucheng Wang
|
Год издания
|
2000
|
Язык документа
|
Английский
|
Файл
|
Доступ ограничен: чтобы загрузить издание, авторизуйтесь на сайте.
|
In the long-term plan the whole river was divided into four portions and the purposes of development were given as follows: • Portion I, starting with Longyangxia in Qinghai, running through Gansu and ending at Qingtongxia in Ningxia. The decision variable D,Is composed of /V, + / elements. HPC was constructed in the locks of the two projects in 1992 and 1993. The shrinkage strain of HPC for in-situ less than that of control due to UEA was used, and moist curing was done fully and .
Данное издание просмотрели 546 раз.